Warning: A non-numeric value encountered in /home/customer/www/totalsimulation.co.uk/public_html/wp-content/themes/rttheme17-05072016/content_generator.php on line 123
TotalSim are proud to announce their involvement in a a new aerodynamic test facility – The Catestby Tunnel.
The tunnel was recently covered in the latest edition of Racecar Engineering with a full feature on the benefits of the tunnel.
For further details on the tunnel please follow the link below.